Schematic is avaiable HERE.
This comment has been removed by the author.
I found two mistakes in this layout.Gain 2&3 should go on the T stripe. It has to go on the gate of Q3.And the 2.2k downer side should go on the U stripe, connecting it to collector of Q4 and gate of Q5.
This comment has been removed by the author.
ReplyDeleteI found two mistakes in this layout.
ReplyDeleteGain 2&3 should go on the T stripe. It has to go on the gate of Q3.
And the 2.2k downer side should go on the U stripe, connecting it to collector of Q4 and gate of Q5.